ATHENS INTERMEDIATE SCHOOL
The delivery method for this project was Construction Management. This project has a heated floor space of 80,000 SF and an open-air control courtyard with 20,000 SF.
This building includes a gymnasium,cafeteria, commercial kitchen, art center,music center, science labs and a computer center in addition to its classroom,administration and medical space.
The majority of the corridors in this structure have false acoustical ceilings with concrete mezzanines above them.
PROJECT SPECS
- FINISH
- May 2002
- FINAL COST
- $8,000,000.00
- TYPE
- School
- MATERIALS
- Concrete Masonry Block,Brick Veneer
- ARCHITECT
- Joyce,Prout and Associates



